The Gotthard Base Tunnel provides a quicker, more reliable link between north and south for both people and goods. SBB is proud to be operating the longest railway tunnel in the world.

How long did it take to make the Gotthard tunnel?

17 years
The Gotthard base tunnel is 57km and in some places 2.3km from the surface. Without ventilation, the temperature inside the tunnel system is 46C (115F). The project took 17 years to build and cost 12.2bn Swiss francs.

How long did it take to build the Gotthard Base Tunnel?

Is the Gotthard tunnel finished?

Work on the Gotthard Base Tunnel was completed in 2016. Twenty minutes later, the sunlight on the southern side can be dazzling as the train bursts out of the Bodio portal and into what, on some days, feels like a different world.

How good was the Gotthard Tunnel?

While a triumph of its era and an example of pioneering engineering, the Gotthard Tunnel was considered to be relatively slow to traverse by twentieth century standards, leading to talk of building a superior successor tunnel as early as the 1940s.

When will the new Gotthard Tunnel be built?

The existing tunnel was at its capacity by 2013. A second tunnel will be built next to the first, following a national referendum. Construction is to start in 2020 and finish in 2027. Relative location and size of Gotthard Tunnel (1882) and Gotthard Base Tunnel (2016) both yellow.

How many people died during construction of the Gotthard Base Tunnel?

Nine people died during construction. The Gotthard Base Tunnel, with a length of 57.09 km (35.47 mi) and a total of 151.84 km (94.3 mi) of tunnels, shafts and passages, is the longest railway tunnel in the world, with a geodetic distance of 55.782 km (34.661 mi) between the two portals.

How many Sachen were there in the Gotthard-basistunnel?

^ “Mit 275 Sachen durch den Gotthard-Basistunnel”. luzernerzeitung.ch. Neue Luzerner Zeitung. 19 November 2015. Retrieved 7 December 2016. ^ “Projektbeschrieb” (in German). AGN Strabag. 24 September 2010. Archived from the original on 8 October 2014. Retrieved 19 October 2010. ^ “Structurally complete tunnels of the Amsteg section handed over”.